0
  • No products in the cart.
Top
World Bank aided Tamil Nadu Irrigated Agriculture Modernization and Water bodies Restoration and Management (TN IAMWARM) Project – Kisan Suvidha
8895
post-template-default,single,single-post,postid-8895,single-format-standard,theme-wellspring,mkdf-bmi-calculator-1.0,mkd-core-1.0,woocommerce-no-js,wellspring-ver-1.2.1,mkdf-smooth-scroll,mkdf-smooth-page-transitions,mkdf-ajax,mkdf-blog-installed,mkdf-header-standard,mkdf-sticky-header-on-scroll-down-up,mkdf-default-mobile-header,mkdf-sticky-up-mobile-header,mkdf-dropdown-slide-from-bottom,mkdf-search-dropdown,wpb-js-composer js-comp-ver-4.12,vc_responsive

World Bank aided Tamil Nadu Irrigated Agriculture Modernization and Water bodies Restoration and Management (TN IAMWARM) Project

World Bank aided Tamil Nadu Irrigated Agriculture Modernization and Water bodies Restoration and Management (TN IAMWARM) Project

Name of Scheme: World Bank aided Tamil Nadu Irrigated Agriculture Modernization and Water Bodies Restoration and Management (TN IAMWARM) Project

Project Area:

 

S.No

Name of Sub-basin

Districts covered

Ongoing projects

 

Varaga Nadhi

Villupuram,Tiruvannamalai

Upper Vellar

Salem

Palar (PAP) & Aliyar (PAP)

Coimbatore, Erode

South Vellar & Pambar

Pudukottai

Manimuthar & Kottakarayar

Sivagangai

Arjunanadhi

Virudunagar

New  projects

 

Pennaiyar

Krishnagiri

Swethanadhi

Salem

Anaivari odai & Chinnar

Perambalur

Agniyar-Upper part & Ambuliyar

Thanjavur,Pudukottai

Upper Vaigai & Varattar-Nagalar

Theni

Upper Gundar & Therkar

Madurai

Nichabanadhi & Kalingalar

Tirunelveli

Sindapalli Uppodai & Sinkottaiar

Virudunagar

Koundanyanadhi & Poiney

Vellore

 

Details of Works:

  • Installation of Drip and Sprinkler Irrigation systems.
  • Underground PVC Pipe laying and community Bore wells
  • Farm mechanization
  • Construction of Farm Ponds
  • Construction of Water Harvesting Structures such as Check dams &
  • Percolation Ponds are proposed to be taken up in the above sub basins.
  • Information, Education, Communication and Capacity Building

Benefits offered (Subsidy):

 

Installation of Drip and Sprinkler Irrigation systems

50% subsidy to farmers subject to the ceiling fixed by Government of India

PVC Pipe laying & Community Bore wells

100% grant to farmers. However, 10% beneficiary contribution is collected for maintenance.

Farm mechanization

100% subsidy to Water Users Association

Construction of Farm ponds

90% subsidy to General Category farmers. 95% subsidy to SC/ST farmers

Construction of Water
Harvesting Structures

100% grant to farmers however the 10% beneficiary contribution is collected for maintenance

Eligibility:

All farmers in the selected sub-basins.

Time-limit for Implementation:

Programme completion annually

Officer to be approached:

  •  Executive Engineer, AED in the District.
  • Superintending Engineer, AED in the Region.
  • Chief Engineer, Agricultural Engineering Department, Nandanam, Chennai-35. Phone 2435 2686, 2435 2622

No Comments

Sorry, the comment form is closed at this time.